Abbreviation Related Automobile Sector
Here Are Some Important Abbreviations And Their Descriptions. I Hope They Are Useful For You. If It's Helpful, Please Share.
- ACR. -Accepted Claim Report
- APQP. -Advance Product Quality Plan
- ASTM. -American Standard For Testing And Material
- BHN. -Brinell Hardness Number
- BOM. -Bill Of Material
- Bx Life. -Reliability Life
- CEO. -Chief Executive Officer
- CSF. -Critical Success Factor
- CNC. Computer Numerical Control
- CFT. -Cross Functional Team
- CFG. -Customer Focus Group
- CQA. -Customer Quality Audit
- CRA. -Customer Reliability Audit
- CMM. -Coordinate Measuring Machine
- DPT. -Dye Penetrant Test
- DFT. -Dry Film Thickness
- DPU. -Defects Per Unit
- DOL. -Direct On Line
- ECD. -Effective Case Depth
- EI. -Elongation
- ES. - Eicher Standard
- EMT. -Effective Material Temperature
- FPIR. First Piece Inspection Report
- FVPA. -Final Vehicle Product Audit
- F/1000. -Failure Per Thousand
- GRN. -Goods Receipt Note
- HV. -Hardness Vickers
- HRC. -Hardness Rockwell On C Scale
- HR. -Human Resource
- HRB. -Hardness Rockwell On B Scale
- HRA. -Hardness Rockwell On A Scale
- HMR. -Hour Meter Reading
- HOD. -Head Of Department
- IDOL. -Improve Direct On Line
- IPIR. -In Process Inspection Report
- IPIR. -Intellectual Property And Innovation Review
- IVC. -Item Vender Combination
- IMARQ. -Improved Manufacturing And Reliability Quality
- IS. -Indian Standard
- LDPU. -Leakage Defect Per Unit
- LRN. -Line Rejection Note
- LQC. -Line Quality Control
- MPCA. -Managing Points And Control Point
- MEBPA. -Modification Effective Break Point Advice
- MTR. -Material Test Report
- MIS. -Management Information System
- 3MIS. -3 Month In Service
- 12MIS. -12 Month In Service
- MPI. -Magnetic Particle Inspection
- NC. -Non Conformance
- NPQA. -New Product Quality Assurance
- NPL. -National Physical Laboratory
- NABl. -National Accreditation Board For Calibration And Testing
- OEM. -Original Equipment Manufacturer
- PRV. -Pressure Release Valve
- PDI. -Pre Dispatch Inspection
- PDD. -Product Design And Development
- PT. -Pre Treatment
- PE. -Product Engineering
- PU. -Poly Urethane
- PPM. -Parts Per Million
- PQR. -Product Quality Report
- PCR. -Product Complaint Register
- PMEBPA. -Product Modification Effective Break Point Advice
- PPAP. -Product Part Approval Process
- QA. -Quality Assurance
- QC. -Quality Control
- QMS. -Quality Management Systems
- RQC. -Receipt Quality Control
- RFT. -Right First Time
- RT. -Radiographic Testing
- SST. -Salt Spray Test
- SQUA. -Supplier Quality Up Gradation Assurance
- SHQ. -Service Head Quarter
- TME. -Testing And Measuring Equipment
- TTR. -Travelling Temperature Recorded
- TCD. -Total Case Depth
- TSA. -Thermo Setting Acrylic
- TS. -Tensile Strength
- TQM. -Total Quality Management
- UT. -Ultrasonic Testing
- UV. -Ultraviolet
- UTM. -Universal Testing Machine
- VD. -Vendor Development
- VMC. -Vertical Machining Center
- WIP. -Work In Progress
- YS. -Yield Strength
Comments
Post a Comment