Abbreviation Related Automobile Sector

Here Are Some Important Abbreviations And Their Descriptions. I Hope They Are Useful For You. If It's Helpful, Please Share.

    1. ACR.   -Accepted Claim Report 
    2. APQP.   -Advance Product Quality Plan 
    3. ASTM.   -American Standard For Testing And Material
    4. BHN.   -Brinell Hardness Number
    5. BOM.   -Bill Of Material 
    6. Bx Life.   -Reliability Life
    7. CEO.   -Chief Executive Officer 
    8. CSF.   -Critical Success Factor
    9. CNC. Computer Numerical Control
    10. CFT.   -Cross Functional Team
    11. CFG.   -Customer Focus Group
    12. CQA.   -Customer Quality Audit
    13. CRA.   -Customer Reliability Audit
    14. CMM.   -Coordinate Measuring Machine
    15. DPT.   -Dye Penetrant Test
    16. DFT.   -Dry Film Thickness
    17. DPU.   -Defects Per Unit
    18. DOL.   -Direct On Line
    19. ECD.   -Effective Case Depth
    20. EI.   -Elongation 
    21. ES.   - Eicher Standard
    22. EMT.   -Effective Material Temperature
    23. FPIR. First Piece Inspection Report 
    24. FVPA.   -Final Vehicle Product Audit
    25. F/1000.   -Failure Per Thousand 
    26. GRN.   -Goods Receipt Note
    27. HV.   -Hardness Vickers 
    28. HRC.   -Hardness Rockwell On C Scale
    29. HR.   -Human Resource
    30. HRB.   -Hardness Rockwell On B Scale
    31. HRA.   -Hardness Rockwell On A Scale
    32. HMR.   -Hour Meter Reading 
    33. HOD.   -Head Of Department
    34. IDOL.   -Improve Direct On Line
    35. IPIR.   -In Process Inspection Report 
    36. IPIR.   -Intellectual Property And Innovation Review
    37. IVC.   -Item Vender Combination
    38. IMARQ.   -Improved Manufacturing And Reliability Quality
    39. IS.   -Indian Standard
    40. LDPU.   -Leakage Defect Per Unit
    41. LRN.   -Line Rejection Note
    42. LQC.   -Line Quality Control
    43. MPCA.   -Managing Points And Control Point
    44. MEBPA.   -Modification Effective Break Point Advice
    45. MTR.   -Material Test Report
    46. MIS.   -Management Information System 
    47. 3MIS.   -3 Month In Service
    48. 12MIS.   -12 Month In Service
    49. MPI.   -Magnetic Particle Inspection
    50. NC.   -Non Conformance
    51. NPQA.   -New Product Quality Assurance
    52. NPL.   -National Physical Laboratory
    53. NABl.   -National Accreditation Board For Calibration And Testing
    54. OEM.   -Original Equipment Manufacturer
    55. PRV.   -Pressure Release Valve
    56. PDI.   -Pre Dispatch Inspection
    57. PDD.   -Product Design And Development
    58. PT.   -Pre Treatment
    59. PE.   -Product Engineering
    60. PU.   -Poly Urethane
    61. PPM.   -Parts Per Million
    62. PQR.   -Product Quality Report
    63. PCR.   -Product Complaint Register
    64. PMEBPA.   -Product Modification Effective Break Point Advice
    65. PPAP.   -Product Part Approval Process
    66. QA.   -Quality Assurance
    67. QC.   -Quality Control 
    68. QMS.   -Quality Management Systems
    69. RQC.   -Receipt Quality Control
    70. RFT.   -Right First Time 
    71. RT.   -Radiographic Testing
    72. SST.   -Salt Spray Test
    73. SQUA.   -Supplier Quality Up Gradation Assurance
    74. SHQ.   -Service Head Quarter 
    75. TME.   -Testing And Measuring Equipment
    76. TTR.   -Travelling Temperature Recorded
    77. TCD.   -Total Case Depth
    78. TSA.   -Thermo Setting Acrylic
    79. TS.   -Tensile Strength
    80. TQM.   -Total Quality Management 
    81. UT.   -Ultrasonic Testing
    82. UV.   -Ultraviolet
    83. UTM.   -Universal Testing Machine
    84. VD.   -Vendor Development
    85. VMC.   -Vertical Machining Center
    86. WIP.   -Work In Progress 
    87. YS.   -Yield Strength

Comments

Popular Posts