Abbreviation Related Automobile Sector


Here Are Some Important Abbreviations And Their Descriptions. I Hope They Are Useful For You. If It's Helpful, Please Share.

    1. ACR.   -Accepted Claim Report 
    2. APQP.   -Advance Product Quality Plan 
    3. ASTM.   -American Standard For Testing And Material
    4. BHN.   -Brinell Hardness Number
    5. BOM.   -Bill Of Material 
    6. Bx Life.   -Reliability Life
    7. CAPA.   -Corrective Action Preventive Action 
    8. CEO.   -Chief Executive Officer 
    9. CSF.   -Critical Success Factor
    10. CNC. Computer Numerical Control
    11. CFT.   -Cross Functional Team
    12. CFG.   -Customer Focus Group
    13. CQA.   -Customer Quality Audit
    14. CRA.   -Customer Reliability Audit
    15. CMM.   -Coordinate Measuring Machine
    16. DPT.   -Dye Penetrant Test
    17. DFT.   -Dry Film Thickness
    18. DPU.   -Defects Per Unit
    19. DOL.   -Direct On Line
    20. ECD.   -Effective Case Depth
    21. EI.   -Elongation 
    22. ES.   - Eicher Standard
    23. EMT.   -Effective Material Temperature
    24. FPIR. First Piece Inspection Report 
    25. FVPA.   -Final Vehicle Product Audit
    26. F/1000.   -Failure Per Thousand 
    27. GRN.   -Goods Receipt Note
    28. HV.   -Hardness Vickers 
    29. HRC.   -Hardness Rockwell On C Scale
    30. HR.   -Human Resource
    31. HRB.   -Hardness Rockwell On B Scale
    32. HRA.   -Hardness Rockwell On A Scale
    33. HMR.   -Hour Meter Reading 
    34. HOD.   -Head Of Department
    35. IDOL.   -Improve Direct On Line
    36. IPIR.   -In Process Inspection Report 
    37. IPIR.   -Intellectual Property And Innovation Review
    38. IVC.   -Item Vender Combination
    39. IMARQ.   -Improved Manufacturing And Reliability Quality
    40. IS.   -Indian Standard
    41. LDPU.   -Leakage Defect Per Unit
    42. LRN.   -Line Rejection Note
    43. LQC.   -Line Quality Control
    44. MPCA.   -Managing Points And Control Point
    45. MEBPA.   -Modification Effective Break Point Advice
    46. MTR.   -Material Test Report
    47. MIS.   -Management Information System 
    48. 3MIS.   -3 Month In Service
    49. 12MIS.   -12 Month In Service
    50. MPI.   -Magnetic Particle Inspection
    51. NC.   -Non Conformance
    52. NPQA.   -New Product Quality Assurance
    53. NPL.   -National Physical Laboratory
    54. NABl.   -National Accreditation Board For Calibration And Testing
    55. OEM.   -Original Equipment Manufacturer
    56. PRV.   -Pressure Release Valve
    57. PDI.   -Pre Dispatch Inspection
    58. PDD.   -Product Design And Development
    59. PT.   -Pre Treatment
    60. PE.   -Product Engineering
    61. PU.   -Poly Urethane
    62. PPM.   -Parts Per Million
    63. PQR.   -Product Quality Report
    64. PCR.   -Product Complaint Register
    65. PMEBPA.   -Product Modification Effective Break Point Advice
    66. PPAP.   -Product Part Approval Process
    67. QA.   -Quality Assurance
    68. QC.   -Quality Control 
    69. QMS.   -Quality Management Systems
    70. RQC.   -Receipt Quality Control
    71. RFT.   -Right First Time 
    72. RT.   -Radiographic Testing
    73. SST.   -Salt Spray Test
    74. SQUA.   -Supplier Quality Up Gradation Assurance
    75. SHQ.   -Service Head Quarter 
    76. TME.   -Testing And Measuring Equipment
    77. TTR.   -Travelling Temperature Recorded
    78. TCD.   -Total Case Depth
    79. TSA.   -Thermo Setting Acrylic
    80. TS.   -Tensile Strength
    81. TQM.   -Total Quality Management 
    82. UT.   -Ultrasonic Testing
    83. UV.   -Ultraviolet
    84. UTM.   -Universal Testing Machine
    85. VD.   -Vendor Development
    86. VMC.   -Vertical Machining Center
    87. WIP.   -Work In Progress 
    88. YS.   -Yield Strength

Comments